My WebLink
|
Help
|
About
|
Sign Out
PC-94-47
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1994
>
PC-94-47
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:34 AM
Creation date
6/29/2005 3:57:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/31/1994
DOCUMENT NO
PC-94-47
DOCUMENT NAME
UP-94-45
NOTES
UNISOURCE/ALCO STANDARD CORP
NOTES 3
REGIONAL HEADQTRS/WAREHOUSE DISTRICT FACILITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />33. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. No grading shall occur between October 15 and <br />April 15, unless approved erosion control measures are in place. subject to the approval of <br />the Building Department. Such measures shall be maintained until such time as permanent <br />landscaping is in place. <br /> <br />34. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />35. Storm drainage swales. gutters, inlets, outfalls, and channels not within the area of a <br />dedicated public street or public service easement approved by the City Engineer shall be <br />privately maintained by the property owner. <br /> <br />36. Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Flood Control District - Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazard Program, the California Department of <br />Fish and Game, and meets the immediate and long-range requirements of this development <br />and all upstream areas intended to be drained through this development. <br /> <br />37. Any damage to existing street improvements caused by the applicant and/or its contractors <br />during construction on the subject property shall be repaired to the satisfaction of the City <br />Engineer at full expense to the developer. This shall include slurry seal, overlay, or street <br />reconstruction if deemed warranted by the City Engineer. <br /> <br />38. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. <br /> <br />39. The applicant shall comply with the City's non-point storm drain run-off ordinance. All <br />storm drainage systems shall be designed to include oil/grease separators to filter the <br />storm water drainage prior to entering the City's storm drain lines in the adjacent public <br />rights-of-ways. The applicant shall submit a maintenance schedule for the separators to <br />the City Engineer for review and approval prior to the issuance of a building permit. The <br />applicant shall also enter into an agreement with the City, prior to the issuance of a <br />building permit, guaranteeing the maintenance of these separators, unless otherwise <br />approved by the City Engineer. <br /> <br />40. The utility plan shall incorporate the use of the available existing water lines that have <br />been stubbed out to the property. <br /> <br />41. All utilities required to serve any existing or proposed development on-site shall be <br />installed underground, unless otherwise determined by the City Engineer <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.