My WebLink
|
Help
|
About
|
Sign Out
PC-94-09
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1994
>
PC-94-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:29 AM
Creation date
6/15/2005 4:11:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/23/1994
DOCUMENT NO
PC-94-09
DOCUMENT NAME
PUD-94-01
NOTES
A.F. EVANS
NOTES 3
146-UNIT APT.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-94-09 <br />Page 14 <br /> <br />v. Electric power distribution, gas distribution, <br />communication service, Cable television, and any required <br />alarm systems shall be installed underground in a joint <br />utility trench unless otherwise specifically approved by <br />the City Engineer or Director of Building Inspection for <br />on-site. <br /> <br />22. The applicant shall work with the Pleasanton Unified School <br />District and the City Planning Director to develop a program, <br />in addition to the school impact fees required by state law <br />and local ordinance, to off-set this project's long-term <br />effect on school facility needs in Pleasanton. This program <br />shall be designed to fund school facilities necessary to <br />off-set this project's reasonably related effect on the <br />long-term need for expanded school facilities to serve new <br />development in Pleasanton. The method and manner for the <br />provision of these funds and/or facilities shall be in place <br />prior to (approval of the final map) (issuance of building <br />permits). In no event shall construction commence unless the <br />above method and manner for the provision of these funds <br />and/or facilities has been approved. <br /> <br />23. This approval does not guarantee the availability of <br />sufficient water to serve the project. The City shall <br />withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is <br />in effect, unless the City has adopted a water offset program <br />and unless the developer is participating in the program. <br />Notwithstanding the developer's participation in such a <br />program, the City may withhold building permits if the City <br />determines that sufficient water is not available at the time <br />of application of building permits. <br /> <br />24. The developer acknowledges that the City of Pleasanton does <br />not guarantee the availability of sufficient sewer capacity to <br />serve this development by the approval of this case, and that <br />the developer agrees and acknowledges that building permit <br />approval may be withheld if sewer capacity is found by the <br />City not to be available. <br /> <br />{end} <br /> <br />I <br /> <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.