Laserfiche WebLink
<br />8. Require Specific Plan development to pay for Sunol Boulevard <br />wideninq improvements (paqe laa of FEIR). <br /> <br />Who: city of Pleasanton. <br />What: Modify the specific Plan to include the cost of <br />Sunol Bouleyard widening improvements along the <br />frontage of Parcels l, 4, and 5 as part of the <br />Specific Plan capital improvement funding. <br />When: Prior to adoption of the Final specific Plan. <br />Who Verifies: Planning Department. <br /> <br />Drainaae <br /> <br />9. Prepare final design plans for creek improvements at Parcels <br />20, 24 and 25 (page 78). <br /> <br />Who: Individual developers. <br />What: Design improvements for creeks within these parcels <br />shall be coordinated between a consulting biologist <br />and the design engineer to ensure that the removal <br />of riparian habitat is avoided where possible. A <br />report shall be submitted to the city identifying <br />repair work, stabilization methods and materials, <br />proposed enhancements and public easement <br />provisions. <br />When: Prior to approval of any development applications <br />on these parcels. <br />Who Verifies: Public Works Department in consultation with the <br />Planning Department. <br /> <br />10. Develop Master Drainage Plan (page 78). <br /> <br />Who: Funding Developers. <br />What: Develop a master drainage plan that addresses on- <br />site drainage and potential downstream and upstream <br />improvements. The plan shall also include an <br />analysis of the capacity, integrity and usefulness <br />of the private upstream dam. All comprehensive and <br />on-site drainage improvements in the stUdy area <br />shall comply with the performance standards <br />contained in the plan as well as the city's "Design <br />Guide 1984" and "Standard Specifications and <br />Details". <br />When: Prior to tentative map approval for either Parcel <br />l8, 20 or 23. <br />Who Verifies: Public Works Department in consultation with the <br />Planning'Department. <br /> <br />11. Follow specific drainage guidelines (pages 78 and 79). <br /> <br />Who: <br />What: <br /> <br />Individual developers. <br />comply with the following specific drainage <br /> <br />- 3 - <br />