My WebLink
|
Help
|
About
|
Sign Out
SR 05:160
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2005 2:12:45 PM
Creation date
6/15/2005 1:56:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/21/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor and Members of the City Council: <br />BACKGROUND <br /> <br />The Engineering Division of the Public Works Department performs engineering studies and <br />design for Capital Improvement Projects either through in-house staff or through contracts <br />with outside consulting firms. This project was selected as a candidate for consultant services <br />due to its complexity and the need for additional engineering support to meet the project's <br />schedule. <br /> <br />PROJECT INFORMATION AND CONSULTANTS SCOPE OF WORK <br /> <br />The Vineyard Avenue Median Streetscape and Pavement Overlay Project, CIP No. 045003 <br />generally consists of a 1.5" rubberized asphalt overlay improvement on Vineyard Avenue <br />between Bernal Avenue and Clara Lane, and on Bernal Avenue between Tawny Drive and the <br />Bernal Avenue's south bridge abutment at Arroyo del Valle. In addition to the overlay, the <br />Vineyard Avenue street improvements will include a 28' travel width on the north side and a <br />20' travel width on the south side. In between the east-west travel lanes will be new raised <br />concrete landscaped median islands (CIP No. 048051). <br /> <br />CONSULTING FIRM SELECTION PROCEDURE <br /> <br />A total of seven Pleasanton frrms providing engineering services were selected from the City's <br />consultant database and were asked to submit responses to a Request for Proposal for Capital <br />Improvement Projects. <br /> <br />The fLrms contacted included: Bellecci & Associates; Berryman & Henigar; Creegan & <br />D'Angelo Consulting Engineers; Kier & Wright Civil Engineers, Inc; Kimley-Horn and <br />Associates; MacKay & Somps Civil Engineers, Inc; and Ruggeri-Jensen-Azar & Associates. <br /> <br />Four firms responded to the Request for Proposal with Statements of Qualifications and Scope <br />of Work. The fn-m of Bellecci & Associates, and Kimley-Horn & Associates were selected <br />for further interviews. Following the interviews, staff determined that Bellecci & Associates <br />was best suited for the design of the Vineyard Avenue Median Streetscape and Pavement <br />Overlay Project. <br /> <br />SR:05:160 <br />Page 2 of 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.