My WebLink
|
Help
|
About
|
Sign Out
PC 06/23/1993
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
1990-1999
>
1993
>
PC 06/23/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2017 2:45:26 PM
Creation date
6/2/2005 9:40:56 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
6/23/1993
DOCUMENT NAME
PC 06/23/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,.- <br /> <br />~ MATTERS INITIATED BY COMMISSION MEMBERS <br /> <br />In response to Chairman Hovingh's inquiry regarding Council's refe <br />planning process, Mr. Swift advised that this item will be placed on <br />Chairman Hovingh requested that a copy of Measure M be included <br /> <br /> <br />of the Ridgelands <br />e July 14 agenda. <br />the staff report. <br /> <br />s:.. PUBLIC HEARINGS <br /> <br />s:..a. UP-93-33. Diablo Gvmnlldics School <br />Application for a conditional use permit to conduct gynmastic I <br />property located at 1279 Quarry Lane. Zoning for the property <br />Development) - Industrial District. <br /> <br />ons for children at the <br />PUD {planned Unit <br /> <br />Mr. Swift presented the staff report recommending approval of Case UP-93-33, subject to <br />the conditions of the staff report. <br /> <br />Commissioner McGuirk commented on the reference under the "Lan Use" section of the <br />staff report to an adjacent business which assembles equipment that roduces foaming agents <br />for sewers, and asked if there is a storage facility that would create harmful situation for <br />the gymnasium. Mr. Swift responded that all storage is inside. <br /> <br />mE PUBLIC HEARING WAS OPENED. <br /> <br />~ <br /> <br />Karlai Pons, 2436 Crescent Drive, Concord, represented the applica . on. She stated that she <br />has read the staff report and is in agreement with the conditions of proval. In response to <br />Commissioner Michelotti's question, Ms. Pons advised that the gy asium is currently <br />located two buildings from the proposed site. <br /> <br />David Crockett, 1279 Quarry Lane, Suite C, advised that he is the <br />Airrigation, the company which occupies the suite adjacent to the pr <br />that the truck and fork lift traffic in the area could present a poten . <br />attending the gymnastics school. He suggested that parking for the <br />northwest quadrant of the parking lot. He expressed concern about <br />exit that will be installed. <br /> <br /> <br />ety officer for <br />sed site. He noted <br />risk to students <br />chool be limited to the <br />tudents using the second <br /> <br />Ms. Pons clarified that the second exit for the suite will be used as emergency exit only <br />and that children will always be kept inside until they are picked up by their parents. <br /> <br />mE PUBLIC HEARING WAS CLOSED. <br /> <br />In response to Chairman Hovingh's question, Mr. Swift advised tha the Building Department <br />will verify that the double doors that will be installed will satisfy th requirements for <br />secondary access. <br /> <br />Planning Commission Minutes June 23, 1993 <br /> <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.