Laserfiche WebLink
Table 6 <br /> Existing. 2010 and 2025 Traffic Volumes with Feasible Mitigations Identified for Selected Intersections <br />Assume all Approved Development Approved Development (2010) with Additional Proposed MitiRations + 2025 Reqional Traffic <br />Mitigations plus construct 3rd eastbound left Control Intemection Eastbound Westbound Northbound Southbound <br />turn lane AM Peak Hour Signal 38 38 C 30 64 C 32 <br /> PM Peak Hour Signal 63 57 45 <br /> <br /> 24 <br /> <br /> <br />