Laserfiche WebLink
PART B <br /> <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2005-2006 <br /> WINDSOR LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br /> NO. 1993-1 <br /> CITY OF PLEASANTON <br /> <br />A. Landscaping (maintenance): 1. Tapestry Way Area A (60,315 sq. ft.) <br /> 2. Creekside Area B (24,673 sq. ft.) <br /> 3. Entry Creekside Area C (16,307 sq. ft.) <br /> <br /> total area 101,295 sq. ft .................................................... $10,923.00 <br /> <br />B. Water <br /> 1. All Planting ................................................................... $ 6,500.00 <br /> <br />C. Power <br /> 1.2 Controllers ($18 per month) ........................................ $ 256.00 <br /> <br />D. Reserve/Long-Term Replacement Fund for scheduled long-term <br /> replacement of various district improvements (see note) ............... $4,880.90 <br /> <br />E. City of Pleasanton Administration Fee ................................................. $1,300.00 <br /> SUBTOTAL $23,859.90 <br /> County Fees for Collection of Assessments .................................. $ 405.90 <br /> GRAND TOTAL ......................................................................... $24,265.80 <br /> Assessment per Unit (90 units) ............................... $269.62 per year <br />Note: <br /> <br />An existing surplus of approximately $29,400.00 exists for Landscape District 1993-1. These funds are held in <br />an interest bearing account until needed for repairs or future replacement of the entry walls, signage, irrigation <br />systems, landscaping or other district features. <br /> <br /> 4 <br /> <br /> <br />