Laserfiche WebLink
<br />26. <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />That approval for the number, type an <br />hydrants be withheld pending final de <br />Fire Marshal, and final review by the <br /> <br />That approval of the sanitary sewer s <br />pending final design and until the de <br />demonstrated to the satisfaction of t <br />the proposed system is adequate, conn <br />point of discharge, and meets both th <br />range requirements of the sanitary sy <br />tributary areas. <br /> <br />That if a sanitary sewer lift station <br />by the development and if it is accep <br />maintenance and operation, an agreeme <br />between the City and the developer pr <br />the final map to the effect that the <br />a maintenance and operation fund for <br />period. <br /> <br />That approval of the storm drainage s <br />pending final design and until the de <br />demonstrated to the satisfaction of t <br />the system is adequate, connects to a <br />discharge, meets any and all applicab <br />Alameda County Flood Control District <br />and all applicable requirements of th <br />Management Flood Hazard Program, and <br />and long-range requirements of this d <br />upstream areas intended to be drained <br />development. <br /> <br />location of fire <br />ign, review by the <br />city Engineer. <br /> <br />stem be withheld <br />eloper has <br />e City Engineer that <br />cts to an approved <br />immediate and long- <br />tem in this and all <br /> <br />is installed for use <br />ed by the City for <br />t shall be completed <br />or to the approval of <br />eveloper will provide <br />minimum ten year <br /> <br />stem be withheld <br />eloper has <br />e City Engineer that <br />approved point of <br />e requirements of the <br />- Zone 7, meets any <br />Federal Emergency <br />eets the immediate <br />velopment and all <br />through this <br /> <br /> <br />30. That electric power distribution, gas distribution, <br />communication service, and any requir d alarm systems be <br />installed underground in a joint util'ty trench unless <br />otherwise specifically approved by th City Engineer. <br /> <br />3l. <br /> <br />That the developer be responsible for <br />the street lighting system serving th <br />street lights shall be 70 watt, high <br />units mounted on galvanized steel pol <br />place bases, on the LS-IC schedule pe <br />and P.G.&E. standard details unless 0 <br />approved. Approval for the number, I <br />electroliers shall be withheld pendin <br />review by the City Engineer. <br /> <br /> <br />the installation of <br />development. The <br />ressure sodium vapor <br />s with poured in <br />City requirements <br />herwise specifically <br />cation, and type of <br />final design and <br /> <br />32. That this development provide a safe nd effective <br />circulation system for bicycles and p destrians. These <br />