My WebLink
|
Help
|
About
|
Sign Out
PC-92-59
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-59
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:55 AM
Creation date
5/4/2005 2:01:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/8/1992
DOCUMENT NO
PC-92-59
DOCUMENT NAME
UP-91-10
NOTES
PLEASANTON GARBAGE SERVICE
NOTES 3
RECYCLING FACILITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />46. That if a sanitary sewer lift station is installed for use by <br />the development and if it is accepted by the City for <br />maintenance and operation, an aqreel!lent shall be completed <br />between the City and the developer prior to the approval of <br />the development to the effect that the developer will provide <br />a maintenance and operation fund for a minimum ten year <br />period. <br /> <br />47. That approval of the storm drain~ge system be withheld pendinq <br />final design and until the developer has demonstrated to the <br />satisfaction of the City Enqineer that the system is adequate, <br />connects to an approved point of disCharge, meets any and all <br />applicable requirements of the Alameda County Flood Control <br />District - Zone 7, l!Ieets any and all applicable requirements <br />of the Federal Emergency Management Flood Hazard Program, and <br />meets the immediate and long-range requirements of this <br />development and all upstreal!l areas intended to be drained <br />through this development. <br /> <br />48. That electric power distribution, gas distribution, <br />communication service, and any required alarm systel!ls be <br />installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer. <br /> <br />49. That the developer be responsible for the installation of the <br />street lighting system serving the development. The street <br />lights shall be 70 watt, hiqhpressure sodium vapor units <br />l!Iounted on galvanized steel pOles with poured in place bases, <br />on the LS-1C schedule per City requirements and P.G.&E. <br />standard details unless otherwise specifically approved. <br />Approval for the number, location, and type of electroliers <br />shall be withheld pending final desiqn and review by the City <br />Enqineer. <br /> <br />50. That this development provide a safe and effective circulation <br />system for bicycles and pedestrians. These facilities shall <br />be designed and installed to the satisfaction of the City <br />Engineer and shall be separated from vehicular traffic <br />whenever possible. <br /> <br />51. That the developer submit detailed landscape and irriqation <br />plan. as part of the improvement plans. These plans should <br />inClUde, where applicable, a street tree planting plan and <br />landscape plans for medians, buffer strips, and any riqht-of- <br />way landscape areas. The irrigation plan shall provide for <br />automatic controls. <br /> <br />52. That any damage to street improvements now eXisting or done <br />during construction on the subject property be repaired to the <br />satisfaction of the City Engineer at full. expense to the <br />developer. This shall include slurry seal, overlay, or street <br />reconstruction if deemed warranted by the City Engineer. <br /> <br />Rev. 2/84 10/84 5/86 10/86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.