Laserfiche WebLink
accessible and identifying alternate routes. The sign design shall be submitted for review <br /> and approval by the Planning Director before installation and shall be installed in <br /> conjunction with the construction of the sidewalk from Sycamore Terrace to San Carlos <br /> Way. <br />16. The project developer shall work out the details and solutions pertaining to runoff, <br /> flooding, and retaining walls between the development covered by this approval and the <br /> property owned by Tom and Mary Greene to the west of the subject property. Said <br /> details shall be shown on the preliminary grading plan submitted with the tentative parcel <br /> map to the satisfaction of the City Engineer and Planning Director. <br /> <br />17. With the parcel map, the project developer shall field survey the location of the shared <br /> property line between the Greenes' property and the property covered by this approval to <br /> the satisfaction and verification of the City Engineer. Any survey document prepared by <br /> the Greenes may be considered, at their option, in the determination of the property line. <br /> Any costs associated with moving the property line onto the Greenes' property shall be <br /> paid by the applicant. The location of the property line shall be staked in the field and <br /> verified as accurate before the approval of the parcel map. <br /> <br />General Conditions: <br /> <br />18. The project developer shall obtain a Building Permit from the Building Department and <br /> any other applicable City permits for the project prior to the commencement of any <br /> constmction. <br /> <br />19. The project developer shall pay any and ail fees including the applicable Zone 7 drainage <br /> fees to which the property may be subject prior to issuance of building permits. The type <br /> and amount of the fees shall be those in effect at the time the building permit is issued. <br /> <br />20. The project developer shall work with the Pleasanton Unified School District and the <br /> City Planning Director to develop a program, in addition to the school impact fees <br /> required by State law and local ordinance, to off-set this project's long-term effect on <br /> school facility needs in Pleasanton. This program shall be designed to fund school <br /> facilities necessary to offset this project's reasonably related effect on the long-term need <br /> for expanded school facilities to serve new development in Pleasanton. The method and <br /> manner for the provision of these funds and/or facilities shall be approved by the City and <br /> in place prior to issuance of building permits. In no event shall construction commence <br /> unless the above method and manner for the provision of these funds and/or facilities has <br /> been approved by the City. <br /> <br />21. This PUD development plan shall be of no further validity and the project developer shall <br /> be required to submit the same or new development plan for City approval prior to the <br /> development of the site in the event that the project developer fails to record a final map <br /> within two years of PUD approval. <br /> <br />22. This approval does not guarantee the availability of sufficient water to serve the project. <br /> The City shall withhold building permits for the project if at the time building permits are <br /> <br /> <br />