Laserfiche WebLink
<br />Resolution No. PC-93-l3 <br />Page 8 <br /> <br />The City shall be granted the rights and remedies of the <br />association, but not the obligation, to enforce the maintenance <br />responsibilities of the property owners association. The CC&R's <br />shall be subject to the review and approval of the city Attorney <br />prior to recordation of any final map. <br /> <br />7. Areas "A", "B", and "C" shall be subject to the permitted and <br />conditional uses of the R-l One Family Residential District as <br />listed under sections 18.32.030 and 18.32.040 of the Pleasanton <br />Municipal Code, except that multi-family dwellings are allowed <br />only in Areas "A" and "B". <br /> <br />8. Construction Phasing <br /> <br />a. Any proposed phasing of this development shall be depicted <br />on the tentative tract map and shall include narrative <br />explaining the proposed phasing. The City Planning <br />Director may approve modifications to said phasing plan so <br />long as satisfactory access is present and other public <br />safety measures are addressed. Unless otherwise approved <br />by the Planning Director, the applicant shall complete all <br />of the on-site improvements in a phase at one time <br />(including all improvements around future building pads). <br />All remaining pad areas shall be seeded and kept in a neat <br />and weed-free manner at all times. <br /> <br />b. with the first construction phase, the developer shall <br />install the landscape/recreation area improvements in the <br />ACTC, as shown on the development plan, to a point on the <br />ACTC concurrent with the eastern leg of "JJ" loop in Area <br />"C". with construction of any portion of the final 50% of <br />the overall project (248 units) the developer shall install <br />the remaining ACTC improvements, and shall remove the <br />existing chain-link fence between the ACTC and Tassajara <br />Creek. <br /> <br />The applicant would be reimbursed by the developer(s) of <br />Hacienda Business Park Lot 60 for their pro-rata share of <br />the construction costs. If, however, these improvements <br />are installed by a developer on HBP Lot 60, then the <br />applicant shall reimburse the Lot 60 developer for this <br />project's share of the costs. <br /> <br />c. with completion of the ACTC landscape/recreation area <br />improvements, the developer shall construct a paved <br />pathway/driveway along the westerly top-of-bank of <br />Tassajara Creek. The pathway/driveway design shall conform <br />to City of Pleasanton and Zone 7 standards. All work to be <br />done in Tassajara Creek requires an encroachment permit <br />from Zone 7. <br />