My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />SECTION 2 <br />FINDINGS REGARDING PROJECT ENVIRONMENTAL IMPACTS <br />DETERMINED TO BE SIGNIFICANT IN THE EIR <br /> <br />pursuant to CEQA Guidelines section 15091, the Design Review Board and <br />planning commission have recommended adoption to the city council the <br />following findings for each significant environmental impact of the <br />project identified in the FEIR as they relate to the project currently <br />proposed. <br /> <br />2.1 Land Use and Planning <br /> <br />ownerShip and Manaqement of common open space <br />Impact: unresolved ownerShip and management of open space <br /> <br />The city finds that approval of the project without resolution of <br />details concerning ownerShip and management of project ownership is <br />a potential significant impact (Draft EIR, page 3-13). <br /> <br />proposed Mitigation Measure of the ZIR: <br /> <br />The EIR identified the following mitigation measure which can <br />substantially avoid this impact. <br /> <br />3-1 Prepare and Adopt an open space Management Plan (Draft EIR, <br />page 3-13). Said mitigation measure was considered and <br />adopted with any pertinent changes as condition 3-1, Exhibit <br />liB" of the Planning commission staff report dated May 27, <br />1992. <br /> <br />Finding: Mitigation Measure 3-1 Feasible and Required <br /> <br />The city finds that it is feasible to mitigate this impact to <br />a less-than-significant level by requiring the applicant and <br />successors in interest to prepare an open space ownership and <br />management program to identify the on-going open space <br />preservation and management mechanisms, responsibilities for <br />improvements and actions. The city will adopt said program <br />for purposes of implementation. The applicant and successors <br />of interest shall incorporate the provisions of such adopted <br />program into project design and implementation as a condition <br />of project approval. <br /> <br />3 <br /> <br />II <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.