Laserfiche WebLink
<br />8. <br /> <br />Mitiqation Measure 4-7: Provide <br />Facilities Between the proiects <br />Boulevard and Arlinqton Drive <br /> <br />pedestrian and Bicvcle <br />street Access on Sunol <br /> <br />Who: Developer, under direction of City Traffic Engineer <br />What: Design and incorporate into the proj ect frontage <br />separate or combined sidewalks or paths for pedestrians and <br />bicycles <br />When: Include as a condition of project PUD approval, with <br />improvements designed and approved by City prior to final map <br />approval <br />Timing: Before acceptance of project street improvements by <br />city <br />Who verifies: City of Pleasanton Public Works Department <br /> <br />CONDITION 5: VISUAL IMPACT AND SITE DESIGN <br /> <br />9. Mitiqation Measures 5-1 throuqh 5-6: To Minimize and/or Avoid <br />visual and site Desiqn ImDacts <br /> <br />Who: Developer/developer's consultants, under direction of <br />the City <br />What: Applicable to each specific <br />identified under Mitigation Measures <br />described above. <br />When: During tentative map preparation <br />Timing: Prior to final map approval <br />Who Verifies: Pleasanton Planning Department <br /> <br />mitigation measure <br />5 . 1 through 5 . 6 as <br /> <br />CONDITION 6: VEGETATION AND WILDLIFE <br /> <br />10. Mitiqation Measure 6-1: <br />RiDarian Habitat <br /> <br />ReDlacement to Minimize Loss of <br /> <br />Who: Developer/Pleasanton Planning Department <br />What: Approval of improvement plan for riparian corridors <br />When: Include as a condition with PUD plan approval. Final <br />details in conjunction with tentative map application <br />Timing: Prior to final map approval <br />Who Verifies: Pleasanton planning Department <br /> <br />11. Mi tiqation Measure 6-2: Minimize pollutants Enterinq RiDarian <br />Areas <br /> <br />Who: Developer/Pleasanton Public Works Department <br />What: Provide infrastructure to reduce chemicals, oil and <br />grease entering riparian areas <br />When: Prior to completion of public improvement plan <br />Timing: At final acceptance of public improvements <br />Who Verifies: Pleasanton Public Works Department <br /> <br />35 <br /> <br />II <br /> <br />. <br />