My WebLink
|
Help
|
About
|
Sign Out
PC-95-84
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1995
>
PC-95-84
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:26 AM
Creation date
4/13/2005 3:41:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/25/1995
DOCUMENT NO
PC-95-84
DOCUMENT NAME
PUD-95-06
NOTES
RED BEAR INC/STANLEY SENIORS
NOTES 3
97-UNIT, 2-STORY SENIORS APARTMENT COMPLEX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-95-84 <br />Page 16 <br /> <br />On-Site Operations <br /> <br />56. All existing wells on the site shall be removed or sealed, <br />filled and abandoned pursuant to Alameda County Ordinance 73- <br />68, prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or special <br />approval is obtained from the City Engineer for temporary use <br />of an existing well for construction water. Any wells <br />designated for abandonment or any wells, encountered during <br />construction, are to be destroyed in accordance with a permit <br />obtained from Zone 7. <br /> <br />57. All existing septic tanks or holding tanks shall be removed or <br />sealed, filled, and abandoned, pursuant to the requirements of <br />the Alameda County Department of Health Services. <br /> <br />58. The developer's contractor (s) shall obtain an encroachment <br />permit from the City Engineer prior to moving any construction <br />equipment onto the site. <br /> <br />59. Any damage to existing street improvements during construction <br />on the subject property shall be repaired to the satisfaction <br />of the City Engineer at full expense to the developer. This <br />shall include slurry seal, overlay, or street reconstruction <br />if deemed warranted by the City Engineer. <br /> <br />60. The haul route for all materials to and from this development <br />shall be approved by the City Engineer prior to the issuance <br />of an encroachment permit. <br /> <br />61. The applicant shall submit a construction Best Management <br />Practices (BMP's) program for review and approval by the <br />Planning Director prior to issuance of building and/or grading <br />permits. These BMP's shall be implemented by the general <br />contractor and all subcontractors and suppliers of materials <br />and equipment. Construction site cleanup and control of <br />construction debris shall also be addressed. Failure to <br />comply with the approved construction BMP may result in the <br />issuance of correction notices, citations, or a stop work <br />order. <br /> <br />The applicant is responsible for implementing the following <br />measures during all construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and <br />place it in a dumpster or other container which is <br />emptied or removed an a weekly basis. When appropriate, <br />use tarps on the ground to collect fallen debris or <br />splatters that could contribute to storm water runoff <br />pollution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.