Laserfiche WebLink
<br />Resolution No. PC-95-65 <br />Page 9 <br /> <br />b. All backflow prevention devices installed with the <br />development shall be painted forest green (pantone Color <br />System Number 2030) and shall be screened from view from <br />pUblic/private streets. Screens shall consist of berms, <br />walls, or landscaping satisfactorily integrated into the <br />landscape plan. Landscape screens shall include <br />shrubbery designed by species and planting density to <br />establish a complete screen within one year from the date <br />of planting. Weather protection devices such as measures <br />to protect pipes from freezing shall require approval by <br />the Planning Director prior to use; at no time shall <br />fabric or other material not designed and/or intended for <br />this purpose be wrapped around or otherwise placed on <br />these devices. All backflow prevention devices shall be <br />shown on the plans submitted for issuance of on-site <br />permits together with screening mechanism and/ or weather <br />protection devices. Proposed screening and weather <br />protection devices shall be reviewed for conformity to <br />these requirements and approved by the Planning Director <br />prior to issuance of an on-site permit. <br /> <br />22. Urban Stormwater Runoff Requirements: <br /> <br />The applicant shall comply with the city's urban clean water <br />run-off requirements as follows: <br /> <br />a. The applicant shall install a structural control, such as <br />an oil/water separator, sand filter, or approved equal <br />(in the parking lot) (on the site) to intercept and <br />pretreat storm water prior to reaching the storm drain. <br />The design, locations, and a schedule for maintaining the <br />separator shall be submitted to the city Engineer/Di- <br />rector of Building Inspection for review and approval <br />prior to issuance of an on-site permit. The structural <br />control shall be cleaned at least twice a year: once <br />immediately prior to October 15 and once in January. The <br />applicant shall enter into a maintenance agreement for <br />the oil/water separator. <br /> <br />b. The applicant shall sweep or vacuum the parking lot a <br />mlnimum of once a month and shall prevent the <br />accumulation of litter and debris on the site. Corners <br />and hard to reach areas shall be swept manually. If the <br />parking lot is pressure washed, debris must be trapped <br />and collected to prevent entry into the storm drain <br />system. No cleaning agent may be discharged into the <br />storm drain. If any cleaning agent or degreaser is used, <br />wash water must be collected and discharged to the <br />sanitary sewer, subject to approval of the Dublin-San <br />Ramon Services District (DSRSD). <br />