My WebLink
|
Help
|
About
|
Sign Out
SR 05:046
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2005 9:48:12 AM
Creation date
3/31/2005 9:23:13 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/5/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:046
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FISCAL IMPACT <br /> <br />Staff anticipates that the maintenance and repair of the new traffic signal control equipmem will <br />initially be less expensive than maintenance of the older equipment that was replaced. Staff is <br />working with Dublin and Livermore staff to draR a joint maintenance agreement that should <br />help minimize future maintenance costs. <br /> <br />Respectfully submitted, <br /> <br />Scott R. Baker Susan Rossi Nelson Fialho <br />Acting Director of Public Works Director of Finance City Manager <br /> <br />SR:05:046 <br />Page 4 of 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.