<br />Resolution No. PC-95-29 <br />Page 9 <br /> <br />42. The applicants shall comply with the city's storm Water <br />Management and Discharge control ordinance. All storm drain <br />systems shall be designed to include oil/grease separators to <br />filter the storm water drainage prior to entering the city's <br />storm drain lines in the adjacent public right-of-ways. The <br />applicant shall submit a maintenance schedule for the <br />separators prior to issuance of a building permit. The <br />applicant shall also enter into an agreement with the city, <br />prior to issuance of a building permit, guaranteeing the <br />maintenance of these separators, unless otherwise approved by <br />the city Engineer. <br /> <br />Building and construction <br /> <br />43. The project shall be designed to meet all accessibility <br />requirements for disabled persons. <br /> <br />44. The applicant shall submit 3 full-size sets of construction <br />plans (wet-stamped and signed), 2 sets of the necessary <br />structural and Title 24 calculations, 2 copies of a site <br />specific soils report, and the completed Building Permit <br />Questionnaire to the Building Department, along with the <br />necessary fees, to initiate the City's plan check process. <br />The plan check will be accepted only after the completion of <br />the Design Review procedure's 15-day appeal period, unless the <br />applicant submits a signed statement acknowledging that the <br />plan check fees may be forfeited in the event that the <br />approval is overturned or the design is significantly changed <br />as the result of an appeal. In no case will a building permit <br />be issued prior to the expiration of the 15-day appeal period. <br /> <br />45. All site improvements and construction activities shall be <br />limited to the hours of 8:00 a.m. to 5:00 p.m., Monday through <br />saturday. All construction equipment must meet DMV noise <br />standards and shall be equipped with muffling devices. <br /> <br />46. The applicant shall submit a construction Best Management <br />Practices (BMP'S) program for review and approval by the <br />Planning Director prior to issuance of building and/or grading <br />permits. These BMP's shall be implemented by the general <br />contractor and all subcontractors and suppliers of materials <br />and equipment. construction site cleanup and control of <br />construction debris shall also be addressed. Failure to <br />comply with the approved construction BMP may result in the <br />issuance of correction notices, citations, or a stop work <br />order. <br /> <br />The applicant is responsible for implementing the following <br />measures during all construction phases of the project: <br />