My WebLink
|
Help
|
About
|
Sign Out
PC-95-20
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1995
>
PC-95-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:19 AM
Creation date
3/30/2005 3:35:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/22/1995
DOCUMENT NO
PC-95-20
DOCUMENT NAME
Z-95-24
NOTES
ROBERT CARTER
NOTES 3
AUTO BODY REPAIL BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-95-20 <br />Page 7 <br /> <br />26. All site improvements and construction activities shall be <br />limited to the hours of 8:00 a.m. to 5:00 p.m., Monday through <br />Saturday. All construction equipment must meet Department of <br />Motor Vehicles (DMV) noise standards and shall be equipped <br />with muffling devices. <br /> <br />27. At no time shall campers, trailers, motor homes, or any other <br />vehicle be used as living or sleeping quarters on the <br />construction site. All such vehicles shall be removed from <br />the site at the end of each work day. <br /> <br />28. If archeological materials are uncovered during grading, <br />trenching, or other on-site excavation, all work on site shall <br />be stopped and the city immediately notified. The county <br />coroner and the Native American Heritage Commission shall also <br />be notified and procedures followed as required in Appendix K <br />of the California Environmental Quality Act. A similar note <br />shall appear on the improvement plans. <br /> <br />29. The developer acknowledges that the City of Pleasanton does <br />not guarantee the availability of sufficient sewer capacity to <br />serve this development by the approval of this case, and that <br />the developer agrees and acknowledges that building permit <br />approval may be withheld if sewer capacity is found by the <br />city not to be available. <br /> <br />30. This approval does not guarantee the availability of <br />sufficient water to serve the project. The city shall <br />withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is <br />in effect, unless the city has adopted a water offset program <br />and unless the developer is participating in the program. <br />Notwithstanding the developer's participation in such a <br />program, the city may withhold building permits if the city <br />determines that sufficient water is not available at the time <br />of application of building permits. <br /> <br />31. The developer shall pay any and all fees to which the property <br />may be subj ect pr ior to the issuance of bui lding permits. The <br />type and amount of the fees shall be those in effect at the <br />time the building permit is issued. <br /> <br />32. All building and/or structural plans must comply with all <br />codes and ordinances in effect before the Building Department <br />will issue permits. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.