Laserfiche WebLink
<br />53. The applicant shall install structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City EngineerlDirector of Building Inspection for review and approval <br />prior to issuance of building permits. The structural control shall be cleaned at least twice <br />a year: once immediately prior to October 1 and once in January. The applicant shall enter <br />into a maintenance agreement for the oil/water separator with the City. <br /> <br />54. The trash enclosure area(s) shall be completely covered. An area drain shall be installed in <br />the enclosure area which connects to the sanitary sewer. No other area shall drain into the <br />trash enclosure; a berm shall be installed to prevent such drainage iffound necessary by <br />the City Engineer/Director of Building Inspection. <br /> <br />55. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation oflitter and debris on the site. Comers and <br />hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain system. If any <br />cleaning agent or degreaser is used, wash water must be collected and discharged to the <br />sanitary sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br /> <br />56. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping -- <br />Drains to Bay" using City approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />Planning Commission Conditions of Approval - Z-95-26 <br /> <br />Page 8 of 8 <br />