Laserfiche WebLink
<br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and equipment off paved or graveled <br />areas during wet weather. Broom sweep the street pavement adjoining the project site <br />on a daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown or <br />in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br />discharge wash water into street, gutters, or storm drains. <br /> <br />57. The project developer shall install the landscaping along the northwest corner of the <br />project site, the area closest to the Ponderosa Homes project's planned single-family <br />residences, at the time of the Phase I construction of the sanctuary. <br /> <br />{end} <br /> <br />8 <br /> <br />. <br />