Laserfiche WebLink
<br />{end} <br /> <br />e) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, flammable, oils, fertilizers, pesticides, or any other materials used on the <br />project site that have the potential for being discharged to the storm drain system <br />through being windblown or in the event of a material spill. <br /> <br />f) Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />g) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h) Construction access routes shall be limited to those approved by the City Engineer <br />or Chief Building Official and shall be shown on the approved grading plan. <br /> <br />10 <br /> <br />1[1 . <br />