Laserfiche WebLink
<br />and located so as to minimize visibility from areas off-site to the greatest extent possible, <br />subject to the review and approval ofthe City Engineer and Planning Director. <br /> <br />45. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. Any damage to existing street <br />improvements during construction on the subject property shall be repaired to the <br />satisfaction of the City Engineer at full expense to the developer. This shall include <br />slurry seal, overlay, or street reconstruction if deemed warranted by the City Engineer. <br /> <br />46. All backflow prevention devices installed with the development shall be painted forest <br />green (Pantone Color System Number 2030) and shall be screened from view from <br />publici private streets. Screens shall consist of berms, walls, or landscaping satisfactorily <br />integrated into the landscape plan. Landscape screens shall include shrubbery designed <br />by species and planting density to establish a complete screen within one year from the <br />date of planting. Weather protection devices such as measures to protect pipes from <br />freezing shall require approval by the Planning Director prior to use; at no time shall <br />fabric or other material not designed and! or intended for this purpose be wrapped around <br />or otherwise placed on these devices. All backflow prevention devices shall be shown on <br />the plans submitted for issuance of building permits together with screening mechanism <br />and/ or weather protection devices. Proposed screening and weather protection devices <br />shall be reviewed for conformity to these requirements and approved by the Planning <br />Director prior to issuance of a building permit. <br /> <br />47. The applicant shall comply with the City's non-point storm drain run-off ordinance. The <br />applicant shall label all on-site storm drain inlets with the wording, "No Dumping-- <br />Drains to Bay" using City-approved methods and materials. <br /> <br />48. The applicant shall include erosion control/storm water quality measures on the final <br />grading plan which shall specifically address measures to prevent soil, dirt, and debris <br />from entering the storm drain system. Such measures may include, but are not limited to, <br />hydro seeding, hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Director of Building Inspection. Ifno grading plan is <br />required, necessary erosion control/storm water quality measures shall be shown on the <br />site plan submitted for an on-site permit, subject to the review and approval of the <br />Director of Building Inspection. The applicant is responsible for ensuring that the <br />contractor is aware of and implements such measures. <br /> <br />49. All cut and fill slopes shall be revegetated and stabilized after completion of grading, but <br />in no case later than October 15. Hydroseeding shall be accomplished before September <br />15 and irrigated with a temporary irrigation system to ensure that the grasses are <br />established before October 15. No grading shall occur between October 15 and April 15 <br />unless approved erosion control/storm water quality measures are in place, subject to the <br />approval of the City Engineer/ Director of Building Inspection. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br />