My WebLink
|
Help
|
About
|
Sign Out
SR 05:069A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:069A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2005 1:59:43 PM
Creation date
3/10/2005 1:00:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:069A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70. <br /> <br />71. <br /> <br />72. <br /> <br />bo <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gavel on them. Do not drive vehicles and' <br />equipment offpaved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked-on mud and dirt from these areas before sweeping. <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br />drain inlet nearest the downstream side of the project site in order to retain <br />any debris or dirt flowing in the storm drain system. Maintain and/or <br />replace filter materials to ensure effectiveness and to prevent street <br />flooding. <br /> <br />do <br /> <br />Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event ora material spill. <br /> <br />Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br />concrete/plaster operations do not discharge wash water into street, gutters, <br />or storm drains. <br /> <br />The applicant shall construct the proposed private street as shown on the PUD <br />plans. The applicant shall obtain the necessary easement right to construct the road <br />on the Bach property prior to the approval of the final map for this project. The <br />grant deed for the EVA, PSE, and PAE from the Bach's shall be recorded prior <br />to/concurrently with the Parcel map. <br /> <br />Access to the proposed parcels shall be from the new private road (lots 2,3 & 4) <br />and from the existing Sycamore Road (lot 1). No access shall be allowed from the <br />new easffwest street. <br /> <br />The typical section for the private road shall be modified to show the PSE <br />ex~ending to the 6 foot wire mesh fence location. <br /> <br />PUD-99-02 <br /> <br />City Council - Conditions of Approval <br /> <br />Page 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.