My WebLink
|
Help
|
About
|
Sign Out
SR 05:069A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:069A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2005 1:59:43 PM
Creation date
3/10/2005 1:00:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:069A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
57. <br /> <br />58. <br /> <br />59. <br /> <br />60. <br /> <br />61. <br /> <br />62. <br /> <br />63. <br /> <br />Approval of the storm drainage system shall be sub]oct to the review and approval <br />of the City Engineer and Zone 7, as applicable, that the system is adequate, <br />connects to an approved point of discharge, meets any and all applicable <br />requirements of the Alameda County Flood Control District - Zone 7, meets any <br />and all applicable requirements of thc F¢cl~ral Emergency Management Flood <br />Hazard Program, the California Department of Fish and Game, and meets the <br />immediate and long-range requirements of this development and all upstream areas <br />intended to be drained through this development. <br /> <br />Electric power distribution, gas distribution, communication service, cable <br />television, and any required alarm systems shall be installed underground in a joint <br />utility trench unless otherwise specifically approved by the City Engineer or <br />Director of Building Inspection. <br /> <br />Should street lighting be desired, the applicant shall be responsible for the <br />installation of the street lighting system serving the development. The street lights <br />shall be generally consistent with the Greenbriar PUD development plan and shall <br />be privately owned and maintained. Approval for the number, location, and type <br />of electroliers shall be subject to the review and approval of the City Engineer. <br /> <br />Street lighting for the development shall be designed and located so as to minimize <br />visibility to the greatest extent possible, subject to the review and approval of the <br />City Engineer and Planning Director. <br /> <br />Any damage to existing street improvements during construction on thc subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense to <br />the developer. This shall include slurry seal, overlay, or street reconstruction if <br />deemed warranted by the City Engineer. <br /> <br />The applicant's contractor(s) shall obtain an encroachment permit fi.om the City <br />Engineer prior to moving any construction equipment onto the site. <br /> <br />The applicant shall comply with the City's non-point storm drain mn-off <br />ordinance. <br /> <br />The applicant shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. <br /> <br />PUD-99-02 <br /> <br />City Council - Conditions of Approval <br /> <br />Page <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.