My WebLink
|
Help
|
About
|
Sign Out
SR 05:069B
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:069B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2005 1:59:43 PM
Creation date
3/10/2005 12:54:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:069B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vehicles. Company, at its expense, will construct the appropriate wall section where the <br />garage doors ~j~ currently~.~ocat~d on the east side of the building. <br />Completed...~ d ?f-~/~?- Date c?/~69/~ ~' <br /> <br />At Company's expense, the Main House and each rental unit shall be reconnected on <br />separate gas, electric and water meters, telephone and cable TV hook-ups. Connection of <br />3 dwelling units to City sanitary sewer system, and c~.~..~ection o.f 3 dwelling units to <br />City water se.~. ,r~.. ,4 ~ '~J~ dh) <br />Completed_ ,~~~-'~ Date <br /> <br />During the relocationofthe Main House, rental units, and garages, Company shall <br />maintain electric power (220V)to the property at all limes for the well, security of the <br />property, safe, of the horses and use of the caretaker. <br /> <br />Complete4 ~. C /.-3a,.~ Date <br /> <br />The Owner shall be reimbursed for the loss of the following improvements: Basement, <br />Concrete, Pool Deck, Sidewalks, Patio, Parking Area, Redwood Deck, Asphalt and <br />Gravel Driveway, Chain Link Fence, Wrought Iron Fence, Landscaping, Swimming <br />Pool, and Tank House. Company and Owner agree that the amount of compensation for <br />all Improvements shall equal One Hundred Fifty Thousand Dollars ($150,000). <br />Company shall have right to salvage any Improvements and reuse at their sole and <br /> <br />Should Company construct a driveway and/or creek crossing on Owner's property on <br />the eastern property line, Company shall be credited the amount oftbe cost of this work <br />against the $150,000. Such eosts shall be reviewed and approved by Owner, such <br />approvalnotto unre na lywithhel~;~. ~ Cz) <br />Completed~ ~ d~c.~ Date ~/~-/~/q ~7 <br /> <br />Company shall be responsible for the abandonment of the four septic systems, and 2) <br />abandonment of 2 existing wells which are in close proximity of the future roadway. <br />Both parties a~gs~ t~e well at the rear of the property is to remain. <br /> 7~ 4- Date ~' <br />Completed_..~3.~. r' ~/37~ ~,~4_ ~ /~?~ <br /> <br />Company shall restore moved units to the same condition they were in prior to said <br />relo on. <br /> <br />CompletecJ.~.~., _/ /.-'~-"_~-.~. Date <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.