My WebLink
|
Help
|
About
|
Sign Out
SR 05:045
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2005 1:57:43 PM
Creation date
3/10/2005 12:32:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February l8,2005 <br /> <br />Mr. James Kelcourse, Senior Civil Engineer <br />City of Pleasanton <br />Public Works Department <br />200 Old Bernal <br />Pleasanton, CA 94566 <br /> <br />Re: <br /> <br />Request for Change Order <br />Santos Ranch Road Pump Stations Project <br /> <br />Dear Mr. Kelcourse: <br /> <br />In response to our recent discussions, Tetra Tech respectfully submits this Change Order Request to <br />increase our compensation for professional engineering services associated with the design of the <br />Santos Ranch Road pump stations and water facility improvements. <br /> <br />A summary of accumulated expenses including the tasks to be performed through bidding, <br />construction and start up, and request for addition work are as follows: <br /> <br />DESIGN CHANGES/MODIFICATIONS <br /> · Accumulated Cost for Bidding Process $26,686 <br /> (including supplemental cost-reduction analysis) <br /> · New Bidding & Construction Administration Assistance $25,114 <br /> · Electrical Inspection Services $ 5,982 <br /> · Start-Up Services $ 3~804 <br /> <br />VALUE ENGINEERING -- GSE <br /> Comments on contractor's (GSE) design package value <br /> engineering review. <br /> <br />Total <br /> <br />$61.586 <br /> <br />$79.014 <br /> <br />VALUE ENGINEERING - TETRA TECH <br /> Detailed in-house analysis of design package to identify further <br /> cost-saving measures. <br /> <br />$74.56~0 <br /> <br />TOTAL CHANGE ORDER REQUEST <br /> <br />$215.160 <br /> <br />Specific to the value engineering tasks, the City requested Tetra Tech to evaluate additional cost- <br />reducing measures for the Santos Ranch Road water system project submitted by GSE, the proposed <br />construction contractor. We have reviewed the suggested changes and prepared the enclosed <br />response to GSE's value engineering comments. <br /> <br />ATTACHMENT B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.