My WebLink
|
Help
|
About
|
Sign Out
PC-96-80
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1996
>
PC-96-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:16 AM
Creation date
3/2/2005 2:10:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/23/1996
DOCUMENT NO
PC-96-80
DOCUMENT NAME
PUD-96-15
NOTES
UTAL PROPERTIES
NOTES 3
26 TOWNHOMES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f . . ~ <br /> <br />Resolution No. PC-96-80 <br />Page 15 <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />into the City storm drain system. Filter materials shall be maintained and/or replaced as <br />necessary to ensure effectiveness and to prevent street flooding. Dispose of filter particles in <br />the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, flammable, oils, fertilizers, pesticides, or any other materials used on the project site <br />that have the potential for being discharged to the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer <br />or Building Inspector and shall be shown on the approved grading plan. <br /> <br />85. The applicant shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. On-site <br />storm drain facilities shall be cleaned a minimum of twice a year as follows: <br />immediately prior to October 15 and once in January. Additional cleaning may be <br />required if found necessary by the City Engineer/Director of Building Inspection. <br /> <br />86. The applicant shall revise the site plan such that the tot lot is located closer to Building 8; the <br />parking in that location is removed to accommodate the tot lot, retaining as much parking as <br />possible; and the soundwall shall be installed around the tot lot. <br /> <br />{end} <br />
The URL can be used to link to this page
Your browser does not support the video tag.