Laserfiche WebLink
<br />Resolution No. PC-96-79 <br />Page 8 <br /> <br />43. Trash enclosures which are sized to contain dumpsters with an individual capacity of 1.5 <br />cubic yards located within five feet of combustible walls, openings, or combustible roof <br />eaves shall be provided with an automatic fire sprinkler system. <br /> <br />Police <br /> <br />44. If required by the Police Department, the building shall be equipped with an alarm <br />system, the type to be approved by the Police Department and that this system shall be <br />installed prior to occupancy of the building. <br /> <br />Engineering <br /> <br />45. The applicant shall submit a final grading and drainage plan prepared by a licensed civil <br />engineer depicting all final grades and on-site drainage control measures, including <br />concrete-lined V -ditches, to protect all cut and fill slopes from surface water overflow. <br />This plan shall be subject to the review and approval of the City Engineer and/or the <br />Director of Building Inspection prior to the issuance of any building permits. <br /> <br />46. The applicant shall submit a refundable cash bond for hazard and erosion control <br />prior to issuance of an Engineering or Building Department permit. The amount <br />of this bond will be determined by the City Engineer. <br /> <br />47. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />48. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than <br />October 15. No grading shall occur between October 15 and April 15 unless approved <br />erosion control measures are in place, subject to the approval of the Building Department. <br />Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />49. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />50. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a <br />dedicated public street or public service easement approved by the City Engineer shall be <br />privately maintained by the property owners or through an association approved by the <br />City. <br />