My WebLink
|
Help
|
About
|
Sign Out
PC-2026-05
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 11:25:24 AM
Creation date
4/13/2026 11:25:20 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/25/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRA <br />F <br />T <br /> <br /> <br /> <br />P26-0045 PC-2026-05, March 25, 2026 <br /> <br />Fees <br /> <br />17. FEES: The applicant shall pay any and all fees to which the property may be subject, <br />prior to issuance of grading and/or building permits, or prior to recordation of the final <br />map, whichever is applicable. The type and amount of the fees shall be those in effect <br />at the time the permit is issued. <br /> <br />18. WATER FEES AND WATER METER CONNECTION FEES: The applicant shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any water meters <br />and irrigation meters, if applicable, prior to building permit issuance. <br /> <br />19. SEWER FEES: The applicant shall pay the applicable Dublin-San Ramon Services <br />District (DSRSD) and City sewer permit fees prior to building permit issuance. <br /> <br />20. SCHOOL IMPACT FEES – COMMERCIAL: Prior to building permit issuance, the <br />applicant shall pay the required commercial development school impact fee as <br />prescribed by State law and as adopted by the Pleasanton Unified School District <br />(PUSD). <br /> <br />TRAFFIC ENGINEERING DIVISION – 925-931-5677 <br /> <br />21. TRAFFIC IMPACT FEES: Based on the Approved Plans, no traffic impact fees are <br />required at this time. However, Traffic Engineering may monitor the site throughout the <br />Conditional Use Permit, as warranted. Should Traffic Engineering observe additional <br />trips during its observations in the PM peak hours that are above and beyond the scope <br />of the Approved Plans, the City Traffic Engineer shall require the applicant to pay for a <br />trip generation "after study" to be completed by the City's on -call transportation <br />consultant. If the trip generation “after study” is reflective of the Approved Plans, no <br />further action shall be needed. If the trip generation is greater than the Approved Plans, <br />the applicant shall be required to pay the City’s Traffic Impact Fees associated with the <br />additional trips and/or have their CUP brought back to the Planning Commission for <br />subsequent review. (Project Specific Condition) <br /> <br />22. PARKING MONITORING. Monitoring of circulation and parking during operational hours <br />may be conducted by Traffic Engineering staff. If parking exceeds the allowed allotment <br />and/or circulation problems arise once the religious facility is in operation, as <br />determined by the City’s Traffic Engineer, this CUP may be submitted to the Planning <br />Commission for their subsequent review at a public hearing. If necessary, the Planning <br />Commission may modify or add conditions of approval to mitigate such impacts or may <br />revoke said CUP. (Project Specific Condition) <br /> <br /><End> <br />Docusign Envelope ID: F4A59783-D370-4CB1-BC1A-1D856FA6BE9D
The URL can be used to link to this page
Your browser does not support the video tag.