My WebLink
|
Help
|
About
|
Sign Out
SR 05:027
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2005 3:59:07 PM
Creation date
1/5/2005 10:48:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/11/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The traffic model forecasts that if the roadway were not widened, the driving time for local <br />drivers on local roadways would stay about the same (+ 1 hour collectively) during the 4:30 to <br />5:30 PM peak hour. The traffic volume change is so minor that the additional driving time is <br />most likely due to the lower travel speeds associated with 2-lane roads versus 4-lane divided <br />roadways. <br /> <br />By removing the Dublin Canyon Road widening from the 1996 General Plan Roadway Network, <br />local drivers would collectively drive about 18 miles less along local City roadways to reach <br />their destinations during the 4:30 to 5:30 PM peak hour. Unfortunately this shift in traffic may <br />be related to more vehicle shortcutting along Laurel Creek Drive instead of using Foothill Road <br />and Dublin Canyon Road. <br /> <br />The traffic model was run to forecast how traffic would change if the Dublin Canyon Road <br />widening were removed from the 1996 General Plan Roadway Network. The following two <br />tables summarize how evening peak hour driving time increases, while diving distances <br />decrease for local drivers when the road widening is removed from the roadway network. <br /> <br /> Table 14 <br />Ci ,tywide Change in Vehicle Hours Traveled if the Dublin Canyon Road Widenine <br /> <br />Were Removed from the General Plan Roadway Network <br /> <br />Trip Purpose <br /> <br />Evening Peak Hour Traffic <br />Local Collector Minor Major <br />Streets Streets Arterials Arterials Total <br /> <br />Home / Work 0 <br />Home / School 0 <br />Home / Shop / Social / Recreation 0 <br />Not to / from Home 0 <br /> <br />0 1 -1 1 <br />0 0 0 0 <br />0 1 -1 1 <br />0 0 0 0 <br /> <br />Hours spent driving <br />Hours spent driving <br />Hours spent driving <br />Hours spent driving <br /> <br />Total 0 <br />Evening Cut-through traffic 0 <br /> <br />0 3 -2 1 <br />0 0 0 1 <br /> <br />Hours spent driving <br />Hours spent driving <br /> <br />SR 05:027 <br />Page 48 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.