My WebLink
|
Help
|
About
|
Sign Out
SR 05:027
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2005 3:59:07 PM
Creation date
1/5/2005 10:48:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/11/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following two tables summarize how morning peak hour driving time increases slightly, <br />while driving distances decrease significantly for local drivers when the widening is removed <br />from the roadway network. <br /> <br />Cut-through traffic is listed separately by roadway type used and is not included in the trip <br />purpose totals. <br /> <br /> Table 8 <br />Citywide Change in Vehicle Hours Traveled if the Foothill Road Widening <br /> <br />Were Removed from the General Plan Roadway Network <br /> <br />Trip Purpose <br /> <br />Morning Peak Hour Traffic <br />Local Collector Minor Major <br />Streets Streets Arterials Arterials Total <br /> <br />Home / Work 0 -2 -4 5 -2 <br />Home / School 0 1 4 0 4 <br />Home / Shop / Social / Recreation 0 0 -1 I 0 <br />Not to / from Home 0 -1 1 2 2 <br /> <br />Hours spent driving <br />Hours spent driving <br />Hours spent driving <br />Hours spent drivin <br /> <br />Total 0 -2 0 7 4 <br /> <br />Morning Cut-through traffic 0 0 -3 0 -3 <br /> <br />Hours spent driving <br />Hours spent driving <br /> <br /> Table 9 <br />Citywide Change in Vehicle Miles Traveled if the Foothill Road Widening <br /> <br />Were Removed from the General Plan Roadway Network <br /> <br />Trip Purpose <br /> <br />Morning Peak Hour Traffic <br />Local Collector Minor Major <br />Streets Streets Arterials Arterials Total <br /> <br />Home / Work 0 15 -327 -18 -330 Miles Traveled <br />Home / School -2 18 -157 -33 -174 Miles Traveled <br />Home / Shop / Social / Recreation 0 10 -115 -1 -105 Miles Traveled <br />Not to / from Home 1 -1 -64 24 -41 Miles Traveled <br /> <br />Total - 1 42 -663 -28 -650 Miles Traveled <br />Morning Cut-through traffic 0 0 -70 -28 -98 Miles Traveled <br /> <br />Morning Peak Hour Cut-through Traffic <br />The 1996 General Plan Roadway Network Model projects that about 145 cut-through vehicles <br />use portions of Foothill Road during the morning peak hour. Based on the miles traveled and <br />travel times for cut-through traffic, it appears that not widening Foothill Road would reduce the <br /> <br />SR 05:027 <br />Page 37 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.