My WebLink
|
Help
|
About
|
Sign Out
PC-96-72
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1996
>
PC-96-72
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:15 AM
Creation date
12/30/2004 1:58:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/25/1996
DOCUMENT NO
PC-96-72
DOCUMENT NAME
UP-96-52/ Z-96-195
NOTES
EAST BAY REGIONAL PARK DISTRICT
NOTES 3
RV CAMPSITES/PAVE PARKING SPACES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-96-72 <br />Page 8 <br /> <br />The applicant is responsible for implementing the following measures during all <br />construction phases of the subject project: <br /> <br />a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use tarps <br />on the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the pavement and <br />storm drains adjoining the project site. During wet weather avoid driving vehicles off <br />paved areas. <br /> <br />c.) Broom sweep the pavement adjoining the project site on a daily basis. Caked-on mud <br />or dirt shall be scraped from these areas before sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />into the City storm drain system. Filter materials shall be maintained and/or replaced as <br />necessary to ensure effectiveness and to prevent flooding. Dispose of filter particles in <br />the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, cement, paints, <br />flammable, oils, fertilizers, pesticides, or any other materials used on the project site that <br />have the potential for being discharged to the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br />storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer or <br />Building Inspector and shall be shown on the approved grading plan. <br /> <br />{ end} <br />
The URL can be used to link to this page
Your browser does not support the video tag.