My WebLink
|
Help
|
About
|
Sign Out
PC-96-67
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1996
>
PC-96-67
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:15 AM
Creation date
12/30/2004 1:48:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/11/1996
DOCUMENT NO
PC-96-67
DOCUMENT NAME
PUD-81-30-67D
NOTES
BRITANNIA DEVT.
NOTES 3
OFFICE BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-96-67 <br />Page 9 <br /> <br />52. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than <br />October 15. No grading shall occur between October 15 and April 15 unless approved <br />erosion control measures are in place, subject to the approval of the Building Department. <br />Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />53. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />54. Storm drainage gutters, inlets, outfalls, and channels not within the area of a dedicated <br />public street or public service easement approved by the City Engineer shall be privately <br />maintained by the property owners or through an association approved by the City. <br /> <br />55. The design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval of the City Engineer. <br /> <br />56. Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Flood Control District - Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazard Program, the California Department of <br />Fish and Game, and meets the immediate and long-range requirements of this <br />development and all upstream areas intended to be drained through this development. <br /> <br />57. Electric power distribution, gas distribution, communication service, cable television, and <br />any required alarm systems shall be installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer or Director of Building Inspection <br />for on-site <br /> <br />58. The applicant shall be responsible for the installation of the lighting system serving the <br />development. The street lights shall be 70 watt, high pressure sodium vapor units <br />mounted on galvanized steel poles with poured in place bases, on the LS-I C schedule per <br />City requirements and P.G.&E. standard details, unless otherwise specifically approved. <br />Approval for the number, location, and type of electroliers shall be subject to the review <br />and approval ofthe City Engineer. <br /> <br />59. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.