My WebLink
|
Help
|
About
|
Sign Out
PC-96-62
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1996
>
PC-96-62
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:15 AM
Creation date
12/30/2004 1:33:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/28/1996
DOCUMENT NO
PC-96-62
DOCUMENT NAME
PUD-81-30-66D
NOTES
BRITANNIA DEVELOPEMENT
NOTES 3
2 OFFICE BLDGS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-96-62 <br />Page II <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br />storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer or <br />Building Inspector and shall be shown on the approved grading plan. <br /> <br />64. The applicant shall install structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City Engineer/Director of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be cleaned at <br />least twice a year: once immediately prior to October I and once in January. The <br />applicant shall enter into a maintenance agreement for the oil/water separator with the <br />City. <br /> <br />65. The trash enclosure area(s) shall be completely covered. An area drain shall be installed <br />in the enclosure area which connects to the sanitary sewer. No other area shall drain into <br />the trash enclosure; a berm shall be installed to prevent such drainage if found necessary <br />by the City Engineer/Director of Building Inspection. <br /> <br />66. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping -- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />{end} <br />
The URL can be used to link to this page
Your browser does not support the video tag.