My WebLink
|
Help
|
About
|
Sign Out
PC-96-60
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1996
>
PC-96-60
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:14 AM
Creation date
12/30/2004 1:28:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/14/1996
DOCUMENT NO
PC-96-60
DOCUMENT NAME
PUD-80-16-8M/ PUD-80-16-13D
NOTES
BRAD HIRST/ THOMAS PROPERTIES
NOTES 3
MAJOR MOD: OFFICE/RESEARCH & DEVT/LIGHT MANUFACTURING BLDG.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-96-60 <br />Page 18 <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or grav- <br />eled areas during wet weather. Broom sweep the street pavement adjoining the pro- <br />ject site on a daily basis. Scrape caked-on mud and dirt from these areas before <br />sweepmg. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown <br />or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not dis- <br />charge wash water into street, gutters, or storm drain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.