Laserfiche WebLink
<br />Resolution No. PC-96-56 <br />Page II <br /> <br />62. Prior to commencement of any clearing, grading, or excavation, the applicant shall <br />submit to the Planning Department a copy of the State Water Resources Control Board <br />Notice of Intent (N0l) for coverage under the State Construction Storm Water General <br />Permit. <br /> <br />63. The applicant shall submit a construction Best Management Practice (BMP) program for <br />review and approval by the Planning Director prior to issuance of any building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed in this program. Failure to comply <br />with the approved construction BMP may result in the issuance of correction notices, <br />citations, or a project stop work order. <br /> <br />64. The applicant is responsible for implementing the following measures during all <br />construction phases ofthe subject project: <br /> <br />a.) Gather all construction debris on a regular basis and place them in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water pollution. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement, and storm drains adjoining the project site. During wet weather avoid <br />driving vehicles off paved areas. <br /> <br />c.) Broom sweep the public street pavement adjoining the project site on a daily <br />basis. Caked-on mud or dirt shall be scraped from these areas before sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing into the City storm drain system. Filter materials shall be maintained <br />and/or replaced as necessary to ensure effectiveness and to prevent street flooding. <br />Dispose of filter particles in the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, flammable, oils, fertilizers, pesticides, or any other materials used on the <br />project site that have the potential for being discharged to the storm drain system <br />through being windblown or in the event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br />