Laserfiche WebLink
<br />Resolution No. PC-96-50 <br />Page II <br /> <br />b. The trash enclosure area(s) shall be completely covered. An area drain shall be in- <br />stalled in the enclosure area which connects to the sanitary sewer. A structural con- <br />trol such as an oil/water separator or sand filter shall be provided. No other area shall <br />drain into the trash enclosure; a berm shall be installed to prevent such drainage if <br />found necessary by the City Engineer/Director of Building Inspection. A sign shall <br />be posted prohibiting the dumping of hazardous materials into the sanitary sewer. <br />The applicant shall notify the Dublin-San Ramon Services District (DSRSD) upon in- <br />stallation of the sanitary connection; a copy of this notification shall be provided to <br />the Planning Department. <br /> <br />c. The owner shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation oflitter and debris on the site. Corners and <br />hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any <br />cleaning agent or degreaser is used, wash water must be collected and discharged to <br />the sanitary sewer, subject to approval of the Dublin-San Ramon Services District <br />(DSRSD). <br /> <br />d. The developer shall label all on-site storm drain inlets with the wording, "No Dump- <br />ing -- Drains to Bay" using City-approved methods and materials. On-site storm <br />drain facilities shall be cleaned a minimum of twice a year as follows: immediately <br />prior to October 15 and once in January. Additional cleaning may be required if <br />found necessary by the City Engineer/Director of Building Inspection. <br /> <br />e. The developer shall include erosion control/storm water quality measures on the final <br />grading plan which shall specifically address measures to prevent soil, dirt, and debris <br />from entering the storm drain system. Such measures may include, but are not lim- <br />ited to, hydroseeding, hay bales, sandbags, and siltation fences and are subject to the <br />review and approval ofthe City Engineer/Director of Building Inspection. The devel- <br />oper is responsible for ensuring that the contractor is aware of and implements such <br />measures. <br /> <br />f. All metal roofs shall be finished with rust-inhibitive paint. <br />