My WebLink
|
Help
|
About
|
Sign Out
ECONOMIC VITALITY COMMITTEE AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2025
>
041725
>
ECONOMIC VITALITY COMMITTEE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 3:25:56 PM
Creation date
12/26/2025 3:25:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/17/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construct the ultimate system. <br /> <br /> • Status Under Review <br /> • Next Steps/Details: Final EIR and Preferred Alternative adopted in May of <br />2021. NEPA process and 30% design began in November <br />of 2021 with anticipated completion November of 2024. <br />Construction to begin after sufficient funding is awarded <br />rough estimate for start of construction is 2027/28 <br /> • Applicant: <br /> • Staff Contact(s): Mike Tassano <br /> <br />35. 680 Express Lane Projects Transportation/Traffic Project <br /> 680 express lanes <br /> The 680 Express Lane is two separate projects. One will construct a new 15-mile express <br />lane from SR 237 in Milpitas to SR 84 in Sunol. The second will extend the express lane <br />from SR 84 to Alcosta. <br /> • Status Approved <br /> • Next Steps/Details: I-680 Express Lane between SR 237 to Milpitas <br />The southbound direction was completed in 2010. The <br />first phase of the northbound project will construct the <br />nine-mile section from Auto Mall Parkway in Fremont to <br />SR 84. The Construction was awarded in November 2017 <br />and construction began in the summer of 2018 and should <br />be completed in 2020. There is no current timeline for <br />Phase 2 of the project. <br />I-680 Express Lane between SR4 and Alcosta Blvd: <br />Draft Environmental Release for public review – March <br />2020 <br />Project Report and Final Environmental Document <br />Approval – August 2020 <br />Final Design and ROW completed - Fall 2021 <br />Construction scheduled to begin Spring 2022 through <br />Summer 2025. <br />Project Cost : Total cost estimate to implement express <br />lanes for both NB and SB directions is $480M. In the light <br />of limited available & anticipated funding and to address <br />near term traffic needs, a decision has been made to <br />proceed with the design, right of way and construction <br />work for the SB direction as the phase 1 of this project. <br />The estimated cost for the SB direction is around $252M. <br />Caltrans has a project in works to pave the existing <br />pavement within approximately the same limits as the <br />express lane. Caltrans has agreed to split their rehab <br />project into NB and SB directions. They plan to move <br />forward with the NB rehab as a stand-alone project which
The URL can be used to link to this page
Your browser does not support the video tag.