Laserfiche WebLink
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />14 <br />May 2025 <br />Design Review <br />The proposed project would be subject to Design Review by the City of Pleasanton. Section <br />18.20.010 of the City’s Municipal Code specifies that the purpose of Design Review is to “preserve <br />and enhance the city's aesthetic values and to ensure the preservation of the public health, safety, <br />and general welfare.” The Design Review process is applicable to development projects that <br />include the construction of new structures, and thus, would apply to the proposed project. <br /> <br />Discretionary Actions <br />The proposed project would require the following approvals from the City of Pleasanton: <br /> <br />• Adoption of the IS/MND; <br />• Adoption of a Mitigation Monitoring/Reporting Program; and <br />• Design Review. <br /> <br />G. ENVIRONMENTAL CHECKLIST <br />The following checklist contains the environmental checklist form presented in Appendix G of the <br />CEQA Guidelines. The checklist form is used to describe the impacts of the proposed project. A <br />discussion follows each environmental issue identified in the checklist. For this checklist, the <br />following designations are used: <br /> <br />Potentially Significant Impact: An impact that could be significant, and for which no mitigation <br />has been identified. If any potentially significant impacts are identified, an EIR must be prepared. <br /> <br />Less Than Significant with Mitigation Incorporated: An impact that requires mitigation to <br />reduce the impact to a less-than-significant level. <br /> <br />Less-Than-Significant Impact: Any impact that would not be considered significant under CEQA <br />relative to existing standards. <br /> <br />No Impact: The project would not have any impact. <br />