<br />Resolution PC-96-37 <br />Page 10 <br /> <br />53. The public sanitary sewer lift station approved for use by the development shall be <br />subject to an agreement between the City and the developer prior to the approval of the <br />final map to the effect that the developer will provide a maintenance and operation fund <br />for a minimum ten year period. <br /> <br />54. Electric power distribution, gas distribution, communication service, Cable television, <br />and any required alarm systems shall be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City Engineer or Director of Building <br />Inspection for on-site. <br /> <br />On-Site Operations <br /> <br />55. The developer's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. <br /> <br />56. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br /> <br />57. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />Urban Clean Water Run-Off <br /> <br />58. The applicant shall submit a construction Best Management Practices (BMP's) program <br />for review and approval by the Planning Director prior to issuance of building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />59. The applicant is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to storm <br />water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and equipment off paved or graveled areas <br />during wet weather. Broom sweep the street pavement adjoining the project site on a <br />daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br />