Laserfiche WebLink
<br />Pleasanton General Plan Update <br />Mitigation Monitoring and Reporting Plan <br />Page 11 <br /> <br />PUBLIC SAFETY <br /> <br /> <br />Impact to be Mitigated: <br /> <br />Strong ground shaking during an earthquake in the Planning Area could cause <br />structural damage to improvements and injwy or loss of life to people. <br /> <br />Agency/Individual <br />Responsible for <br />Implementation: <br /> <br />City of Pleasanton to adopt and enforce specified policy and programs; <br />developers of individual projects to carry out specified studies and use <br />specified construction designs. <br /> <br />Implementation Timing: <br /> <br />Design of individual projects and structures. <br /> <br />Mitigation Specifications: <br /> <br />Adopt and implement the following policies and programs: <br /> <br />Policy 2: Investigate the potentiaJ for seismic hazards during the devel- <br />opment review process, and implement soil engineering and <br />construction standards which minimize potential danger from <br />earthquakes. <br /> <br />Program 2.1 Require site-specific soils, geologic, and/or geotechnical <br />engineering studies prior to development approval of struc- <br />tures for hwnan occupancy for any project proposed within <br />areas shown on current Alquist-Priolo Earthquake Fault <br />Zones Maps. Also, require such studies for any project pro- <br />posed within areas identified with "Moderately High" to <br />"Extreme" seismic shaking amplification (General Plan Table <br />V-3 and Figure V-4). <br /> <br />Program 2.2 Design and construct all structures to address potentiaJ seis- <br />mic and geologic hazard conditions according to the State <br />Uniform Building Code standards or more stringent stan- <br />dards. All structures and facilities not addressed by the UBC <br />shall be designed and constructed to mitigate potential seis- <br />mic and geologic hazards as recommended by site-specific <br />soils, geologic, and/or geotechnical engineering studies. <br /> <br />Program 2.5 Require technical review and analysis of soils, geologic, and <br />geotechnical studies by a qualified consulting engineering <br />geologist reporting to the City of Pleasanton. Incorporate the <br />recommendations of the City's consulting engineer into the <br />project design. <br />