Laserfiche WebLink
<br /> <br /> <br />P24-0420 and P24-0421 PC-2025-10, May 14, 2025 <br /> <br />Green Building and Sustainability Measures <br /> <br />32. CLIMATE ACTION PLAN 2.0 COMPLIANCE: Prior to building permit issuance, a GHG <br />Emission Compliance Checklist shall be provided to the Planning Division for review <br />and approval by the Director of Community Development. The measures shall be <br />shown on the building permit plans submitted to the Building and Safety Division. The <br />Checklist shall include notation indicating the sheet(s) the measure can be found. Prior <br />to building permit final, all of the measures indicated on the approved checklist shall be <br />inspected and approved by the City of Pleasanton. <br /> <br />33. ALL-ELECTRIC: Except as modified by these conditions, this project is to have no new <br />gas infrastructure installed. This and all exceptions shall be noted on the plans <br />submitted for Building Permits to the satisfaction of the Chief Building Official and the <br />Director of Community Development. (Project Specific Condition) <br /> <br />34. EV CHARGERS: All EV chargers shall be universal and not proprietary to a ny one <br />brand of EV. (Project Specific Condition) <br /> <br />Construction Practices and Noticing <br /> <br />35. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Saturday. No construction shall be allowed on State <br />or Federal Holidays or Sundays. The Director of Community Development may allow <br />earlier “start times” or later “stop times” for specific construction activities, e.g., concrete <br />pouring. All construction equipment shall meet Department of Motor Vehicles (DMV) <br />noise standards and shall be equipped with muffling devices. Prior to construction, the <br />hours of construction shall be posted on site. <br /> <br />36. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar <br />vehicle are not allowed on the construction site except when needed as sleeping <br />quarters for a security guard subject to receipt of a temporary conditional use permit <br />(per PMC 18.116.010.E). <br /> <br />37. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on <br />the project site for daily administration/coordination purposes during the construction <br />period. <br /> <br />38. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare <br />a construction and parking management plan to address impacts and parking demands <br />during the construction phase of the project. The construction and parking management <br />plan shall be subject to review and approval by the City Traffic Engineer and Director of <br />Community Development prior to issuance of a demolition permit, or the first building <br />permit, whichever comes first. The following items shall be incorporated into the <br />construction and parking management plan: <br /> <br />Docusign Envelope ID: FAF97CD7-AB31-442B-8140-E29B00129772