Laserfiche WebLink
<br /> <br /> <br /> <br />place until final landscape inspection by the Landscape Architecture Division. Removal <br />of such fencing prior to approval may result in a “stop work order.” <br /> <br />41. SHADE TREES: There shall be a minimum of 50 percent shade cover in the parking <br />area within 15 years. There shall be a minimum of 20 percent shade cover in any <br />commercial landscape areas within 15 years. There shall be a minimum of 20 percent <br />shade cover over any hardscape areas in a non-residential environment within 15 <br />years. Project Specific <br /> <br />PUBLIC WORKS DEPARTMENT – LAND DEVELOPMENT – 925-931-5650 <br /> <br />42. CONDITIONS OF APPROVAL: These Conditions of Approval shall be depicted on a <br />plan sheet(s) in the submitted plans for construction. (Address this condition prior to <br />plan approval) <br /> <br />43. ENGINEERING DIVISION FEES FOR SERVICE: The Engineering Division assesses <br />fees for services including plan-check, permit issuance, and inspection according to the <br />City’s adopted Master Fee Schedule. These fees are separate and distinct from fees <br />assessed by the Community Development Department (including Planning and Building <br />Division fees). The applicant is responsible for payment of all Engineering Division fees <br />prior to services rendered or permit issuance, whichever is first. (Address this condition <br />prior to plan approval) <br /> <br />44. ADHERENCE TO CITY STANDARDS: All public improvements shall be designed and <br />constructed in conformance with the City of Pleasanton Municipal Code and the City’s <br />adopted Standard Specifications and Details in effect at the time of issuance of the <br />permit(s). Said standards are available for download at: <br />https://www.cityofpleasantonca.gov/our-government/public-works/engineering/ (Address <br />this condition during all aspects of design and construction) <br /> <br />45. CLEAN WATER PROGRAM (HYDROMODIFICATION PROJECTS): Because the <br />project creates and/or replaces more than 43,560 square feet (1.00 acre) of impervious <br />surface, increases impervious surface over pre-project conditions, and is located in a <br />susceptible area, it is considered a Hydromodification (HM) Project according to <br />Provision C.3.g of the Municipal Regional Stormwater NPDES Permit. Said permit <br />regulates stormwater runoff in Pleasanton. The Alameda Countywide Clean Water <br />Program developed a C.3 Guidance Manual to assist applicants in addressing these <br />regulations. The Guidance Manual is available for download at: <br /> <br />https://www.cleanwaterprogram.org/businesses/development.html <br /> <br />46. HM projects must include stormwater treatment measures in the site design to cause no <br />increase in the erosion potential of the receiving stream over the pre-project (existing) <br />condition. To demonstrate compliance, the City encourages use of the Bay Area <br />Hydraulic Model (BAHM). The model software can be downloaded at no cost from <br />Clear Creek Solutions. (Address this condition prior to plan approval) <br /> <br />Docusign Envelope ID: 690AB28A-6A62-4ECB-9309-BC535EFC672BDocusign Envelope ID: 36B10924-68B9-4DAB-B45F-74C5F45ECB94