Laserfiche WebLink
<br /> <br /> <br /> <br />f. Soil management report (if not previously submitted). <br /> <br />28. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br />installed as shown on the approved building permit set and shall be inspected and <br />approved by the Landscape Architecture Division. <br /> <br />29. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro <br />seed mixture designed by the applicant’s landscape architect and approved by the <br />Landscape Architecture Division prior to installation. The erosion control shall be <br />maintained by the applicant until permanent landscaping is in place. <br /> <br />30. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices <br />and above ground irrigation controls shall be located and screened to minimize their <br />visual impacts. These devices with their proposed screening shall be shown on the <br />landscaping and utility plans submitted with the building permit plans or improvement <br />plans and shall be subject to the review and approval of the City Landscape Architect <br />prior to their installation. If above-ground, they shall be painted forest green or an <br />equivalent dark-green color. Screens shall consist of berms, walls, or landscaping <br />satisfactorily integrated into the landscape plan. Landscape screens shall include <br />shrubbery designed by species and planting density to establish a complete screen <br />within 1 year from the date of planting. Weather protection devices, such as measures <br />to protect pipes from freezing, shall require approval by the City Landscape Architect <br />prior to use; at no time shall fabric or other material not designed and/or intended for <br />this purpose be wrapped around or otherwise placed on these devices. Project <br />Specific <br /> <br />31. MAINTENANCE: The applicant and all future owners of the property shall, at no <br />expense to the City, maintain all the landscaped areas related to the project in a <br />healthful, attractive and reasonably weed-free manner consistent with the approved <br />landscape plan, for the duration of the existence of the project. <br /> <br />32. SITE LIGHTING: All site lighting shall be designed for consistency with the International <br />Dark-Sky Association’s (IDA) Model Lighting Ordinance. This project site shall be <br />considered to be in an LZ-2 zone for design purposes. Lighting shall be subject to <br />review and approval by the City Landscape Architect prior to building permit issuance. <br />Project Specific <br /> <br />Trees <br /> <br />33. TREE REPORT: The applicant shall comply with the recommendations of the tree <br />report prepared by Torrey Young with Dryad, LLC dated November 22, 2024, including <br />the addendum dated March 14, 2025. No tree trimming or pruning other than that <br />specified in the tree report shall occur. The applicant shall arrange for the Project <br />Arborist to conduct a field inspection prior to building permit issuance to ensure all <br />recommendations have been properly implemented. The Project Arborist shall certify in <br />writing all recommendations have been followed. <br /> <br />Docusign Envelope ID: 690AB28A-6A62-4ECB-9309-BC535EFC672BDocusign Envelope ID: 36B10924-68B9-4DAB-B45F-74C5F45ECB94