Laserfiche WebLink
<br />Page 4 <br /> <br />9. FENCE/WALL: All fencing and walls shall be shown on the construction plans with <br />the building permit submittal in conformance with the Approved Plans. Any proposed <br />modifications shall be subject to review for conformance to the Objective Design <br />Standards by the Planning Division prior to issuance of building permits. <br /> <br />10. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit <br />submittal in conformance with the Approved Plan. The plan shall include photometric <br />contours, manufacturer’s specifications on the fixtures, and mounting heights. Any <br />proposed modifications shall be subject to review for conformance to the Objective <br />Design Standards by the Planning Division prior to issuance of building permits. <br /> <br />11. BUILDING SURVEY: The applicant shall submit a building survey and/or record of <br />survey and a site development plan in accordance with the provisions of Chapter <br />18.68 of the PMC. These plans shall be approved by the Chief Building Official prior <br />to building permit issuance. The site development plan shall include all required <br />information to design and construct site, grading, paving, drainage, and utilities. <br /> <br />12. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br />certification prepared by a California licensed land surveyor or registered civil <br />engineer to the Chief Building Official and Director of Community Development <br />certifying the pad elevations and building locations (setbacks) are conforming to the <br />approved plans, prior to receiving a foundation inspection for the structures. <br /> <br />13. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height <br />certification prepared by a California licensed land surveyor or civil engineer to the <br />Director of Community Development before the first framing or structural inspection <br />by the Building and Safety Division. The height of the structures shall be surveyed <br />and verified as being in conformance to the approved building heights as shown on <br />Exhibit B or as otherwise conditioned. <br /> <br />14. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br />occupancy. <br /> <br />15. TRANSFORMERS: New electrical transformers shall be placed underground, or <br />aboveground and screened from view to the satisfaction of the Director of <br />Community Development. Details of the new electrical transformers, and any <br />screening architecturally compatible with the building, shall be included in the <br />building permit submittal and shall be subject to the review and approval of the <br />Director of Engineering/City Engineer and Director of Community Development prior <br />to building permit issuance. <br /> <br />16. MECHANICAL EQUIPMENT – SCREENING: The applicant shall effectively screen <br />from view all ducts, meters, air conditioning equipment, and any other mechanical <br />equipment, whether on the structure, on the ground, or on the roof, with materials <br />architecturally compatible with the building in conformance with the Approved Plan <br />and Objective Design Standards. Screening details shall be shown on the plans