Laserfiche WebLink
<br />Resolution No. PC-96-09 <br />Page 12 <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br />storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer or <br />Building Inspector and shall be shown on the approved grading plan. <br /> <br />66. The applicant shall install structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City Engineer/Director of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be cleaned at <br />least twice a year: once immediately prior to October 1 and once in January. The <br />applicant shall enter into a maintenance agreement for the oil/water separator with the <br />City. <br /> <br />67. The trash enclosure area(s) shall be completely covered. An area drain shall be installed <br />in the enclosure area which connects to the sanitary sewer. No other area shall drain into <br />the trash enclosure; a berm shall be installed to prevent such drainage if found necessary <br />by the City Engineer/Director of Building Inspection. <br /> <br />68. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation of litter and debris on the site. Corners and <br />hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br />agent or degreaser is used, wash water must be collected and discharged to the sanitary <br />sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD) <br /> <br />69. The restaurant shall include a contained area for cleaning mats, containers, and <br />equipment. The wash area shall be covered or shall be designed to prevent runoff onto or <br />from the area. The area shall be connected to the sanitary sewer, subject to approval by <br />DSRSD, or shall be collected in a containment area and removed regularly by a disposal <br />and recycling service. If connected to the sanitary sewer, a structural control such as a <br />sand filter or oil/ water separator shall be used, and a sign shall be posted prohibiting the <br />dumping of hazardous materials. Other methods may be used subject to the approval of <br />the Director of Building Inspection. The applicant shall instruct employees to conduct all <br />washing activities in this area. <br /> <br />70. The applicant shall work with staff to modifY the landscape bulb at the Chabot Drive <br />driveway to enhance traffic safety. <br />