Laserfiche WebLink
<br />Resolution No. PC-96-09 <br />Page 10 <br /> <br />53. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than <br />October 15. No grading shall occur between October 15 and April 15 unless approved <br />erosion control measures are in place, subject to the approval of the Building Department. <br />Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />54. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />55. Storm drainage gutters, inlets, outfalls, and channels not within the area of a dedicated <br />public street or public service easement approved by the City Engineer shall be privately <br />maintained by the property owners or through an association approved by the City. <br /> <br />56. The design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval of the City Engineer. <br /> <br />57. Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Flood Control District - Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazard Program, the California Department of <br />Fish and Game, and meets the immediate and long-range requirements of this <br />development and all upstream areas intended to be drained through this development. <br /> <br />58. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping -- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />59. Electric power distribution, gas distribution, communication service, Cable television, <br />and any required alarm systems shall be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City Engineer or Director of Building <br />Inspection for on-site <br /> <br />60. The applicant shall be responsible for the installation of the lighting system serving the <br />development. The street lights shall be 70 watt, high pressure sodium vapor units <br />mounted on galvanized steel poles with poured in place bases, on the LS-I C schedule per <br />City requirements and P.G.&E. standard details, unless otherwise specifically approved. <br />Approval for the number, location, and type of electroliers shall be subject to the review <br />and approval of the City Engineer. <br /> <br />---~,---~.~~.'"--_..._-_._'-----'_._--_.- ----- ----- ------ . <br />