My WebLink
|
Help
|
About
|
Sign Out
PC-96-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1996
>
PC-96-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:11 AM
Creation date
12/29/2004 2:05:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/14/1996
DOCUMENT NO
PC-96-08
DOCUMENT NAME
PUD-81-30-62D
NOTES
CHAMARRO DESIGN GROUP/ BRITANNIA DEVELOPMENT
NOTES 3
ONE-STORY BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-96-08 <br />Page 9 <br /> <br />49. The applicant shall submit a refundable cash bond for hazard and erosion control prior to <br />issuance of an Engineering or Building Department permit. The amount of this bond will <br />be determined by the City Engineer. <br /> <br />50. The design for the line, grade, and structural sections for the streets serving this <br />development shall be subject to final review and approval by the City Engineer. <br /> <br />51. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />52. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than <br />October 15. No grading shall occur between October 15 and April 15 unless approved <br />erosion control measures are in place, subject to the approval of the Building Department. <br />Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />53. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />54. Storm drainage gutters, inlets, outfalls, and channels not within the area of a dedicated <br />public street or public service easement approved by the City Engineer shall be privately <br />maintained by the property owners or through an association approved by the City. <br /> <br />55. The design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval ofthe City Engineer. <br /> <br />56. Approval of the storm drainage system shall be subject to the review and approval ofthe <br />City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Flood Control District - Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazard Program, the California Department of <br />Fish and Game, and meets the immediate and long-range requirements of this <br />development and all upstream areas intended to be drained through this development. <br /> <br />57. Electric power distribution, gas distribution, communication service, Cable television, <br />and any required alarm systems shall be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City Engineer or Director of Building <br />Inspection for on-site <br /> <br />-~---,-_.--_..-_..__..._--- --_.--- <br />
The URL can be used to link to this page
Your browser does not support the video tag.