Laserfiche WebLink
Page 11 of 11 <br />CLOSING STATEMENT <br />Wilson General Contracting Inc’s proposal carries numerous unwaivable material defects, failed to adhere to the <br />requirements set forth in the RFP documents, did not meet the mandatory Bidder Qualification and Experience <br />Requirements set forth in the RFP, failed to identify any relevant experience, and is mathematically incapable of <br />achieving an Evaluation Score greater than 17 Points when evaluated according to each Evaluation Criteria and <br />scored as identified pursuant to the selection process established in the RFP documents Pursuant to the facts <br />presented above, Wilson General Contracting Inc’s proposal should be rejected as non-responsive, and the Project <br />awarded to Integra as the lowest responsible and responsible Bidder with the highest overall final score. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Alexander Giammona <br />President <br />Integra Construction Services, Inc. <br /> <br />Cc: Wilson Magat, Wilson General Contracting Inc ([email protected]) <br />Lauren Stec, Lanak & Hanna ([email protected]) <br />Adam Nelkie, City of Pleasanton ([email protected]) <br />