Laserfiche WebLink
Page 4 of 11 <br /> <br />It is well established under California law that material defects are not subject to doctrine of discretionary <br />waiver. Material defects cannot be waived, and the bid must be rejected. (1) (2) (3) (4) (5) (6) <br /> <br />b) Wilson General Contracting Inc failed to include the signed Addendum No. RB1 with their proposal as <br />required per RFP Page 11 of 26 and Addendum No. RB1 Page 2. (Fig. 6) (Fig. 7) <br /> <br /> <br /> <br /> <br /> <br /> <br />(1) Desilva Gates Constr., LP v. Dep't of Transp., 242 Cal.App.4th 1409, 195 Cal.Rptr.3d 891 (Cal. App. 2015) <br />(2) Ghilotti Construction Co. v. City of Richmond, 53 Cal.Rptr.2d 389, 45 Cal.App.4th 897 (Cal. App. 1996) <br />(3) Valley Crest Landscape, Inc. v. City Council, 49 Cal.Rptr.2d 184, 41 Cal.App.4th 1432 (Cal. App. 1996) <br />(4) Konica Business Machines U. Inc. v. Regents of University of California, 253 Cal.Rptr. 591, 206 Cal.App.3d 449 (Cal. App. 1988) <br />(5) Taylor Bus Service, Inc. v. San Diego Bd. of Education, 241 Cal.Rptr. 379, 195 Cal.App.3d 1331 (Cal. App. 1987) <br />(6) Menefee v. County of Fresno, 210 Cal.Rptr. 99,163 Cal.App.3d 1175 (Cal. App. 1985) <br />Fig. 6 <br />RFP – Fire Alarm Retrofit Project CIP 23457 RE-BID Page 11 of 26 <br />Fig. 7 <br />CIP No. 23457 Re-Bid – Addendum No. RB1 Page 2 of 2